A FASTER WAY TO BUILD.

<7 MONTHS

From start of construction to move-in.

PRECISION BUILT, OFF SITE


Prefabricated mass timber panels are cut and assembled off-site, then delivered flat-packed directly to your property.

YOUR SITE GETS READY IN PARALLEL


Meanwhile, your site is prepped with the foundation and crane system, so everything is in place by the time the panels arrive.

PANELS ARE CRANED INTO PLACE


Once on site, the crane lifts each panel into position, so the structure goes up in a fraction of the time of a traditional build, with far less noise and mess.

≤ 7

months from start of construction to move-in.

900

square feet in each unit.

Flat-packed

delivery, ready for assembly.

A fast, simple timeline.

RAISED IN DAYS, NOT MONTHS.


Factory-cut panels arrive ready to set, so the structure comes together quickly and the site stays quieter, cleaner, and less disrupted.

Less time in a construction zone.
More time enjoying your home.

Traditional Building Systems

Saltbox

Timeline


Source


Site

✔ Quieter, faster, cleaner construction

✘ A longer, noisier, and dustier build

✘ Often 12+ months, if a contractor even has availability

✔ Built in 7 months or less

✘ All building takes place on site, resulting in more disruption

✔ Factory-cut panels and assembled on site



Smart materials, built to go together.

Finished to fit your neighborhood.

Every Saltbox arrives ready for real wood shingles in timeless colorways, from a bold charcoal to a soft, weathered coastal grey. Our designers can match the finish to your property and the homes around it.

TAKE THE NEXT STEP 

Get your Saltbox process started to build a healthier space in seven months.

Inquire With Your Interest